The last shipment of South Korean K2 Black Panther tanks and K9 Thunder self-propelled howitzers this year has arrived in Poland. In the coming days, two brigades of the 16th Mechanized Division—which is responsible for defending areas near the borders with Russia and Belarus—will receive several dozen vehicles, according to Forsal.pl.

The new equipment will strengthen the division’s tank and artillery capabilities. For the Polish Army, this marks another step in rebuilding its capabilities following the transfer of a significant portion of its older weaponry—including T-72 and PT-91 tanks, as well as howitzers—to Ukraine.

The pace of execution of the South Korean contracts has caught the attention of the Ukrainian defense publication Defense Express. Its analysts note that just over a year passed between the signing of the second implementation agreement for the K2 and the arrival of the first vehicles.

180 tanks and a production line in Gliwice

Tank deliveries are continuing under the second implementation agreement dated August 1, 2025: 180 vehicles worth approximately $6.5 billion. Of these, 116 tanks in the K2GF configuration—similar to the South Korean version—are scheduled to be delivered by 2027, while another 64 in the Polish-adapted K2PL version will be delivered between 2028 and 2030. Most of the K2PL tanks will be assembled at the Bumar-Łabędy plant in Gliwice, meaning that Poland will resume production of heavy armored vehicles after a hiatus of nearly two decades.

According to the Polish Ministry of National Defense, 61 K2PLs will be manufactured in Gliwice, while the first three tanks of this version will be built in South Korea for testing. Compared to the K2GF, the Polish-modified vehicles will be equipped with an active protection system, an anti-drone system, and additional armor. The first contract for 180 tanks was fully fulfilled on November 13, 2025, and the 2022 framework agreement provides for the procurement of up to 1,000 K2 and K2PL tanks, according to gov.pl.

K9 Howitzers and Weaknesses in the Defense Industry

At the same time, Poland is acquiring K9 Thunder howitzers under an implementation agreement dated December 1, 2023, worth approximately $2.6 billion. The contract calls for 152 howitzers, including 146 in the Polish-adapted K9PL version.

Jerzy Aleksandrowicz, an expert at the Casimir Pulaski Foundation, warned in an interview with BiznesAlert.pl that engines and powertrain components remain the Achilles’ heel of Polish tank manufacturing: the country lost these capabilities following the closure of the PZL Wola plant, so it has to purchase such engines for tanks and howitzers abroad. At the same time, in his opinion, the Korean side is more open to cooperation than partners from the U.S. or Germany, reports BiznesAlert.pl.

“Technology transfer covers many—even hundreds—of components. It’s not just about assembling supplied parts into a finished system. It’s about gradually producing an ever-increasing share of components in Poland, which makes economic sense,” Alexandrovich emphasizes.